Bathroom remodeling is the best way after kitchen remodeling to increase your home’s sales value. One done can garner a higher price when you sell your residence although it can be a large one or a bathroom remodel. A bathroom remodel can make life easier and more enjoyable if you do not plan to market in the future. Two lists may be wanted by you. Make one a list of necessities and the second a list of optional things you want on your bathroom remodel if at all possible.

Shower Door Toilet Check List to Consider

  1. Design: Before beginning a bathroom remodel make time to design the room that is. There are numerous layout software programs that are useful you can use if you are currently doing it yourself. You might want the Tuscany motif or a design that is classic. If you hire a professional designer, work on this step with her before going. Have a look at images and samples of paint tiles, fixtures and substances.
  2. Permits: With your layout completed, you understand what you intend to do on your bathroom remodel. You will need to have permits. If you are using the services of contractors, be sure all licenses are in order before work is started.
  3. Walls: This might be the first step if walls are to be transferred. Move a doorway or you might want to bring a window. Plan carefully.
  4. Flooring: Most bathroom remodeling jobs include some sort of floor work. If shower, bathroom, tub or sink should be moved, you will need plumbing changes. New holes will be produced in your floor. You might need sub flooring. This step will follow the motion of walls.
  5. Plumbing: This section of bathroom remodeling calls for a professional that is certified. Make sure that you have one scheduled at the time if you are not a plumber.
  6. Electrical: Much anzzi shower doors bathroom remodeling involves changes in light fixtures. Changing a light bulb is straightforward. Adding lighting is not. To get this component of your bathroom remodel if you are not a practitioner, schedule an electrician as above.
  7. Decorating: Once walls and flooring are done; plumbing and power re-routed or are installed, other elements of your bathroom remodeling project and fixtures reach fruition and it is time. No bathroom remodel is complete without decorating. Leave time to get it done right.

Bathroom remodeling check lists are available from your contractor. Lists that are detailed are posted by contractors online. The main thing is to take time to plan the bathroom job. Get quotes from at least two contractors or a quote from the contractor. Everything is composed with time and cost estimates. Your bathroom remodel is going to be as painless as possible if you do.